Horizon
All apps

Compliance

Permits

Permit to work that is fast on site and tight on control.

Start a work request, decide if a permit is needed, route approvals, and keep approved permits on a live register. Supervisors can see what is open, who signed, and when validity ends, without chasing a clipboard.

app.horizon-ecosystem.com
Permit register
12 active
PermitSiteStatus
PTW-4821 · Hot WorkWorkshop 2Approved
PTW-4822 · Confined SpaceTank FarmPending
PTW-4815 · Working at HeightTower AApproved
PTW-4799 · ExcavationNorth YardExpired

Approval required · PTW-4822

Confined space entry awaiting authorised gas test sign-off.

The problem

Paper permit to work is slow to raise and hard to audit in real time. When hot work, confined space, work at height, excavation, electrical, or isolation sits on a clipboard in the site office, supervisors cannot see what is open, who approved it, or what is about to run out of time.

Built for the way safety actually works

Horizon Permits is a permit to work product for high-risk jobs on site.

You raise a work management form, choose which high-risk permit types apply, upload the pack, and submit for review. Issuers and SMEs check standards and sign off before a permit is written to the register. The receiver gets the approved permit and field PDF. From there the live record carries suspend, revalidate, cancel, and close-out.

Workflows, site standards, permit types, approval gates, notifications, roles, and related setup can be configured to the operation. Out of the box you get a working permit flow. Admin then tunes it to how your sites actually run.

The register shows approved and live permits. Status and validity sit on each permit so the team can see what is ready, open, suspended, or closed. Drafts stay in the review flow until they are approved.

How it works

  1. 1

    Raise a permit

    Start a work request on phone, tablet, or desk. Capture site, scope, planned times, and which high-risk types apply. Attach SWMS, licences, and other evidence. Permit types and form templates are configurable for your sites.

  2. 2

    Route for approval

    Submit for review. Issuers and SMEs complete standards checks and sign-off gates before a permit can be approved. Which standards apply, who must sign, and which gates block issue are set up for the operation.

  3. 3

    Work under control

    Approved permits land on the live register with a durable number, conditions, and a validity window. Condition templates can be configured by site and category. The receiver works from the live record and field PDF.

  4. 4

    Track and close out

    Reports surface permits nearing the end of validity or already past it. Close-out, cancel, suspend, and revalidate keep the same number under control. Once live, changes go through those steps.

What it changes

Faster in the field

Raise and approve on a phone or tablet instead of walking paper to the site office.

Nothing slips through

Validity and status sit on the live register and in reports, so pending review and expired windows are visible.

Accountable sign-off

Multi-step issuer and SME gates record who authorised the work and against which standards.

Real-time oversight

One register view across sites for approved and live permits.

Everything in Permits

  • Work request through approve, live register, and close-out
  • Multi-step issuer and SME approvals with hard gates before issue
  • Live register of approved and live permits
  • Validity window on each permit, with reporting on soon and overdue
  • Responsive web on phone, tablet, or desk
  • High-risk types including hot work, confined space, height, excavation, electrical, and isolation
  • Configurable workflows, site standards, permit types, approval gates, notifications, and roles
  • Multi-site register and operational reports

Frequently asked

Yes. The flow is a responsive web app. Issuers and requesters can work from a phone or tablet without going back to a desk.

See Permits in action

Book a personalised demo and we'll tailor it to your operation.